CHBE446Process Engineering Economics and Design IISpring 2024 |
Teams |
Project #1 | ||
---|---|---|
Team | Topic | Members |
1 | 3 gas+ammonia | Ahlayah Edmonds, Hablon Kouassi, Ethan Ravotta, Mary Akshetha Sherry |
2 | 8 CH4+hybrid | Jonathan Capps, Lydia Stricker, Jeffrey Tsao, Christine Zhou |
3 | 5 gas+membrane | Olivia Anderson, Riordan Correll-Brown, Thomas Ogunsola, Vipulan Sritharan |
4 | 6 coal+membrane | Aaron Forest, Daniel Ivanov, Catherina Samson, Jillian Schwartz |
5 | 4 coal+ammonia | Lane Crofton, Tran ND Do, Michael Schachter, Parnian Tabarzadi, Samaa Zaman |
6 | 9 fuel | Natalya Brown, Christopher Duchak, Andrew Loveland, Elisa Zeng-Mariotti |
7 | 7 electrolysis | Gianna Borgese, Justin Graves, Matthew Jarvis, Kiana Yip |
8 | 10 energy storage | Nicholas Thomas, Jacob Wheeler, Matthew Wyble, Nicole Zhang |
9 | 2 coal+amine | Himadhri De Jacolyn Seneviratne, Luke Hakun, Reuben Spencer, Hayden Whitley |
10 | 1 gas+amine | Abid Khalid, Madelyn Kohler, Darren Nguyen, Aimrick Nya Nya, Peter Sabo |
Project #2 | ||
---|---|---|
Team | Topic | Members |
1 | gas-to-liquid | Riordan Correll-Brown, Tran ND Do, Justin Graves, Jillian Schwartz, Christine Zhou |
2 | power-to-liquid | Thomas Ogunsola, Catherina Samson, Marry Sherry, Vipulan Sritharan, Elisa Zeng-Mariotti |
3 | coal-to-liquid | Olivia Anderson, Natalya Brown, Ahlayah Edmonds, Madelyn Kohler |
4 | power-to-gas | Jonathan Ryan Capps, Matthew Jarvis, Andrew Loveland, Lydia Stricker |
5 | biomass-to-liquid | Himadhri De Jacolyn Sereviratne, Luke Hakun, Abid Khalid, Parnian Tabarzadi |
6 | mAb | Nicholas Thomas, Jeffrey Tsao, Kiana Yip, Nicole Zhang |
7 | biomass-to-liquid | Lane Crofton, Daniel Ivanov, Ethan Ravotta, Samaa Zaman |
8 | gas-to-liquid | Hablon Kouassi, Darren Nguyen, Michael Schachter, Jacob Wheeler |
9 | power-to-gas | Christopher Duchak, Aaron Forest, Reuben Spencer, Matthew Wyble |
10 | AAV | Gianna Borgese, Aimrick Nya Nya, Peter Sabo, Hayden Whitley |
Schedule |
Week | Date | Topic | Due | |
---|---|---|---|---|
2 | 1/29 | Overview | syllabus, assemble teams, project #1 overview | |
3 | 2/05 | Project 1 | team presentations
Team 6 Aspen: material balance & reaction of custom compounds (e.g., CHxOyNz etc.) Team 8 theory/Aspen: heat transfer/exchangers Team 7 theory & non-Aspen simulation: staged separation unit-ops (absorber/stripper, distillation, etc.) Team 5 Aspen simulation: staged separation unit-ops (absorber/stripper, distillation, etc.) Team 10 theory & non-Aspen simulation: centrifugation/sedimentation Team 9 Aspen simulation: centrifugation/sedimentation Team 4 theory & non-Aspen simulation: filtration/dialysis/membrane Team 1 Aspen simulation: filtration/dialysis/membrane Team 3 theory/non-Aspen simulation: kinetics/reactors (steam reforming & Habor-Bosch) Team 2 Aspen simulation: kinetics/reactors (steam reforming & Habor-Bosch) | |
4 | 2/12 | Project 1 | Interim Report 1.1
Individual meeting slots M2:00pm Team 5, 4 coal, ammonia carbon capture M2:15pm Team 1, 3 natural gas, ammonia carbon capture M2:30pm Team 7, 7 electrolysis M2:45pm Team 6, 9 fuel in NH3 economy M3:00pm Team 4, 6 coal, membrane carbon capture M3:15pm Team 9, 2 coal, amine carbon capture M3:30pm Team 10, 1 natural gas, amine carbon capture M3:45pm Team 2, 8 CH4 + hybrid M4:00pm Team 8, 10 modular electrical energy storage M4:15pm Team 3, 5 natural gas, membrane carbon capture | |
5 | 2/19 | Project 1 | Interim Report 1.2 | |
6 | 2/26 | Project 1 | Interim Report 1.3 | |
7 | 3/04 | Project 1 | Interim Report 1.4 | |
8 | 3/11 | Project 1 | Interim Report 1.5
Project #1 preliminary report (team, optional) | |
3/18 | Spring Break | |||
9 | 3/25 | Project 1 | Project #1 final presentation/report (team) | |
10 | 4/01 | Project 2 | Overview project description | |
11 | 4/08 | Project 2 | Interim Report 2.1
Individual meeting slots M2:00pm Team 3, coal-to-liquid M2:15pm Team 4, power-to-gas (AIChE) M2:30pm Team 2, power-to-liquid M2:45pm Team 5, biomass-to-liquid M3:00pm Team 7, biomass-to-liquid M3:15pm Team 8, gas-to-liquid M3:30pm Team 10, AAV M3:45pm Team 9, power-to-gas (AIChE) M4:00pm Team 1, gas-to-liquid M4:15pm Team 6, mAb | |
12 | 4/15 | Project 2 | Interim Report 2.2 | |
13 | 4/22 | Project 2 | Interim Report 2.3 | |
14 | 4/29 | Project 2 | Interim Report 2.4
Project #2 preliminary report (team, optional) | |
15 | 5/06 | Project 2 | Project #2 final presentation/report (team) |