ERICA+
ERICA+
- ERICA depends on measurements about rate and the target utilization, if utilization is set to a high number the capacity allocated to drain the queues becomes insufficient
- ERICA did not use queue lengths as a possible factor in determining ER
- ERICA+ uses queue lengths also