OSU Scheme(cont.)
OSU Scheme(cont.)
If load factor is close to 1; switch gives different feedback to the sources:
Also called “Target Utilization Band (TUB) Algorithm”
Previous slide
Next slide
Back to the first slide
View Graphic Version